Skip to content

Web design · 6 min read

How much does a website cost in India? Real 2026 ranges

₹15,000 and ₹15,00,000 are both real prices for "a website" in India — because they buy completely different things. Here's what actually separates them, in rupees and dollars.

Published

"How much does a website cost in India" doesn't have one answer, because "a website" isn't one product. A five-page brochure site, a Shopify store selling four hundred products, and a custom booking platform all get called "a website" by the person asking for a quote, and they cost wildly different amounts for reasons that are usually invisible until someone explains them. Here are the real ranges, and what actually pushes a project from one end to the other.

Business websites: ₹80,000 – ₹3,00,000

This is the range for a straightforward business site — five to fifteen pages, a design that's custom to your brand rather than a stock template, a content management system you can actually edit, and the technical basics done properly: fast loading, mobile-first layout, and search-engine-readable HTML. At roughly ₹95.1 to the dollar, that's about $840 to $3,150. The low end typically means fewer pages and a simpler design system; the high end usually means more pages, more custom interaction design, or content in more than one language.

Below ₹80,000, you're almost always buying a template with your logo swapped in, built by someone reselling a theme rather than designing around your business. That can be a fine decision for a very early-stage business that needs something live this week — but know that's what you're buying, and budget for a proper rebuild once the business has traction.

What separates the low end of this range from the high end

A ₹80,000 business site usually means five to eight pages, a design built from a smaller set of reusable page templates, and a single round of revisions. A ₹3,00,000 site usually means twelve pages or more, distinct layouts designed for specific sections rather than one repeated template, custom illustration or photography direction, and enough revision rounds that the client and the designer actually converge on something both sides are happy with. The jump in price buys attention, not just extra pages — most of it goes into design decisions that a template-based build never makes at all.

Shopify and ecommerce builds: ₹1,50,000 – ₹5,00,000

In dollars, that's roughly $1,580 to $5,260. Ecommerce costs more than a brochure site for concrete reasons: product catalogues need proper structure for search visibility, checkout has to handle real payment gateways and shipping logic, and most stores need at least one or two integrations — inventory sync, an ERP, a marketplace feed. Shopify keeps hosting, security and PCI compliance off your plate, which is why it's usually the cheaper and more predictable route compared to a fully custom cart.

Where a Shopify build lands in that range depends mostly on catalogue size, how much custom functionality you need beyond what a theme and app ecosystem already does, and how many payment and logistics integrations you're connecting. A forty-product store with Razorpay and standard shipping sits near the bottom. A four-hundred-product store with UPI, cash on delivery, custom pricing tiers and ERP sync sits near the top.

Custom software and platforms: ₹4,00,000 and up

That's roughly $4,210 and climbing, with no natural ceiling — a genuine platform build can run into the tens of lakhs depending on scope. This tier is for things that aren't really "a website" at all: internal tools, customer portals, booking and reservation systems, multi-role dashboards, anything with business logic specific to how you operate. The jump from the ecommerce tier isn't about page count, it's about the software having to model your actual workflow rather than display a catalogue.

What actually drives the number

Across all three tiers, the same handful of factors decide where a quote lands:

  • Page and screen count — more pages means more design and content work, not just more files
  • Custom design versus template — a design system built for your brand costs more than adapting an existing theme, and should
  • Integrations — payment gateways, CRMs, ERPs, booking engines. Each one is scoped, tested and maintained work, not a checkbox
  • Content — who is writing and supplying the copy and images changes the timeline and the price more than most people expect
  • Timeline — a rushed build compresses testing time, which either costs more or costs quality
  • Ecommerce and software complexity — custom logic, multi-currency, multi-language and role-based access all add real engineering hours

Typical timelines by tier

Price and timeline move together, and knowing both helps you judge whether a quote is realistic. A straightforward business site takes roughly three to five weeks from kickoff to launch. Larger builds — bigger catalogues, custom functionality, more integrations — run six to twelve weeks. Custom software is scoped and delivered in phases rather than as one block, specifically so you're not committing the full budget before you've seen anything working. Anyone quoting a full custom platform in two weeks is either underscoping the work or planning to cut corners you'll pay for later.

Ongoing costs after launch

The build price is not the whole cost of owning a website. Hosting and a domain are small but recurring — typically a few thousand rupees a year for a business site, more for ecommerce depending on traffic. Beyond that, most businesses want somebody to handle updates, security patches and small content changes, which is usually a modest monthly retainer rather than a large fixed fee. Budget for this separately rather than being surprised by it — a site with no ongoing care tends to quietly fall behind on speed, security and search visibility within a year or two.

Why the cheapest quote is usually the most expensive one

A quote well below these ranges is not a discount — it's a different, smaller product wearing the same label. The common pattern: no real CMS, so every text change means paying the developer again; no attention to Core Web Vitals, so the site loads slowly and both visitors and Google's ranking algorithm penalise it; and no documentation or handover, so if the freelancer disappears, you can't get into your own site. The cost of fixing that later — a full rebuild, plus the lost time and traffic in between — is almost always higher than paying properly the first time.

The same pattern shows up one tier up, on ecommerce builds. A cut-rate store often skips catalogue schema entirely, which means product pages never show up properly in Google's shopping results — a silent, ongoing cost that never appears on the invoice but shows up every month in the traffic the store never gets. Cheap ecommerce isn't cheap once you count the sales it structurally can't win.

So, how much should you actually budget?

If you're not sure which tier your project falls into, that's normal — most people asking "how much does a website cost in India" haven't scoped their own project yet, and the honest answer depends entirely on what you tell a builder once they ask the right questions. A short scoping conversation, before any number gets quoted, is what turns these three ranges into an actual figure for your business.

Getting an honest number for your project

The only way to know where your project actually lands in these ranges is to scope it — page count, integrations, content ownership, and timeline, laid out before anyone commits to a number. That's what we do on a first call, whether the answer turns out to be a business website, an ecommerce build, or something that's really custom software once we've talked it through.

Related service

Web design & development

Custom websites built to load fast, rank in Google and convert visitors into enquiries. Fixed scope, fixed price, and you own everything at the end.

Got a question this didn’t answer?

Ask it directly. We answer questions like these all day, and you won’t get a sales sequence for it.